The security assessment of the working point set by the energy markets is one of the main tasks of any System Operator (SO). The experience of vertically-integrated utilities in the use of probabilistic methods has proved to be very useful also in the new deregulated environment: an increasing number of SOs is presently enforcing with probabilistic tools the deterministic criteria traditionally employed to validate the ex-ante dispatching. Very challenging, promising and discussed, but not yet well-established, is conversely the use of probabilistic tools also for real-time decision-support and very short-term dispatching. The computational complexity of many time-consuming algorithms has constituted for years a crucial barrier; nowadays, the availability of cheap and fast computers discloses new opportunities for probabilistic techniques also for purposes of on-line security assessment. In this paper a probabilistic technique for real-time security assessment and operational decision-making is proposed and described. The use of a novel power system simulator, based on a Sequential Monte Carlo technique, is applied to very short-term dispatching, in order to alert the SO if the system reliability is about to decrease in the next few hours, thus anticipating critical contingencies and supporting the control room to find the most cost-effective corrective action. A case study relevant to the IEEE Reliability Test System RTS-96 is shown and discussed
Copyright © 2013 Praise Worthy Prize - All rights reserved.

Keywords


Control Rooms; Load Dispatching; Monte Carlo Methods; Power System Reliability

Full Text:

PDF


References


P.L.Noferi, L.Paris, L.Salvaderi, Montecarlo methods for power system reliability evaluations in transmission and generation planning, Proceedings of the Annual Reliability and Maintainability Symposium, Washington DC, January 1975.

M.Mazumdar, Comparison of algorithms for computing generating-system reliability indexes, Electric Power Research Institute (EPRI), 1983.

J.Endrenyi, P.F.Albrecht, R.Billinton, G.Marks, N.Reppen, L.Salvaderi, Bulk power system reliability assessment - Why and How? - 2. How?, IEEE Transactions on power apparatus and systems, Vol.101, Issue 9, September 1982.

Y.Wang, X.Han, Y.Ding, Power system operational reliability equivalent modeling and analysis based on the Markov chain, IEEE International Conference on Power System Technology, POWERCON, 2012.

A.K.Verma, V.V.Venu, Adequacy-based power system reliability studies in the deregulated environment, International Journal of Reliability, Quality and Safety Engineering, Vol.15, Issue 2, 2008.

B. Hobbs, P. Meier, Energy Decisions and the Environment - A Guide to the Use of Multicriteria Methods, Kluwer Academic Publishers, Norwell, MA., 2000.

Yang, Ming Han, Xue-shan Jiang, Zhe Cheng, Yun-zhi Lee, Wei-jen, A novel method for advanced dispatch considering response risk constraints, North American Power Symposium (NAPS), October 2009.

Y.Zhao, Z. Shen, N.Zhou, Q.Liu, Probabilistic uncertainty analysis of Monte-Carlo simulation for bulk power system reliability evaluation, Proceedings of the Chinese Society of Electrical Engineering, Vol.28 Issue 61, 2008.

Zapata, C.J., Kirschen, D.S., Ríos, M.A., Torres, A., Modeling of protective system failures to operate for reliability studies at the power system level using stochastic point processes, (2010) International Review of Electrical Engineering (IREE), 5 (1), pp. 311-316.

Y.Wang, X.Han, Y.Ding, Monte Carlo simulation method for reliability analysis of power network including substation configuration, Power System Protection and Control, Vol.40 Issue 5, 2012.

Y.Wang, X.Han, X.Li, Y.Ding, Study on Monte Carlo simulation method for reliability analysis of generalized power network, Asia-Pacific Power and Energy Engineering Conference, APPEEC, 2012.

IEEE Task Force on Probabilistic Aspects of Reliability Criteria of the IEEE PES Reliability, Risk and Probability Applications Subcommittee, Probabilistic security assessment for power system operations, Power Engineering Society General Meeting, Vol. 1, 2005, pp. 212–220.

C.Sabelli, G.Giannuzzi, C.Martarelli, M.Sidoni, M.Pozzi, C.Bruno, D.Dresco, D.Di Bernardo, Very short-term optimal dispatching: An integrated solution for the advance dispatching, 44th International Conference on Large High Voltage Electric Systems, Paris, 2012.

A.Ehsani, A.Karimizadeh, H.Fallahi, A.Jalali, A comparison of deterministic and probabilistic methods for determining the required amount of spinning reserve, World Academy of Science, Engineering and Technology, Vol.60, 2009.

S.Chen, S.Kumar, Smart Automatic Generation Control, IEEE PES General Meeting, 2012.

D.L.Yao, S.S.Choi, K.J.Tseng, Design of short-term dispatch strategy to maximize income of a wind power-energy storage generating station, IEEE PES Innovative Smart Grid Technologies Asia (ISGT), 2011.

D.L.Yao, S.S.Choi, K.J.Tseng, Determination of short-term power dispatch schedule for a wind farm incorporated with dual-battery energy storage scheme, IEEE Transactions on Sustainable Energy, Vol.3, Issue 1, 2012.

Z.Hao, H.Yuehui, Li Peng, Day-Ahead Power Grid Optimal Dispatching Strategy Coordinating Wind Power, Power and Energy Engineering Conference (APPEEC), 2011.

K.Liu, J.Zhong, Generation dispatch considering wind energy and system reliability, IEEE PES General Meeting, 2010.

C.Ma, Short term hydropower dispatching optimization of cascaded hydropower stations based on two-stage optimization, 2nd International Conference on Industrial and Information Systems, 2010.

C.Ji, W.Xie, X.Zhang, Z.Yang, L.Zhu, Study of the scheduling rules of short-term power generation dispatching for single hydropower station, International Conference on Industrial Control and Electronics Engineering, ICICEE, 2012.

J.Lian, C.Ma, Short-term optimal dispatching of cascade hydropower stations in competitive power market, Journal of Hydroelectric Engineering, Vol.26 Issue 4, 2006.

S.Rebennack, N.Iliadis, J.Kallrath, P.Pardalos, Short term portfolio optimization for discrete power plant dispatching, IEEE Power and Energy Society General Meeting, PES '09, 2009.

P.Pelacchi, D.Poli, The influence of wind generation on power system reliability and the possible use of hydrogen storages, Electric Power System Research, Vol.80 Issue 3, 2010.

Z.Ma, Researchs with Monte Carlo simulations for power system reliability assessment, Power System Protection and Control, Vol.37, 2009.

H.Zhang, Y.Yin, H.Shen, S.Liang, H.Wang, Peak-shaving margin evaluation associated with wind power integrated system based on sequential Monte-Carlo method, Automation of Electric Power Systems, Vol.36, 2012.

Zapata, C.J., Kirschen, D.S., Rios, M.A., Torres, A., Reliability assessment of protective schemes considering time varying rates, (2009) International Review of Electrical Engineering (IREE), 4 (6), pp. 1440-1446.

B.Canizes, J.Soares, Z.Vale, H.Khodr, Hybrid fuzzy Monte Carlo technique for reliability assessment in transmission power systems, Energy, Vol.45 Issue 1, 2012.

C.Ma, J.Lian, Short term hydropower dispatching optimization of cascaded hydropower junctions based on cluster genetic algorithm, Journal of Tianjin University Science and Technology, Vol.43, Issue 1, 2010.

Manbachi, M., Mahdloo, F., Ataei, A., Haghifam, M.R., New interface for coordinated maintenance scheduling of generating units in neighbor countries applying genetic algorithm and Monte-Carlo Simulation, (2011) International Review of Electrical Engineering (IREE), 6 (4), pp. 1748-1756.

T.Niknam, R.Azizipanah-Abarghooee, A.Roosta, Reserve Constrained Dynamic Economic Dispatch: A New Fast Self-Adaptive Modified Firefly Algorithm, IEEE Systems Journal, Vol.6, Issue 4, 2012.

Le, D.D., Bovo, C., Berizzi, A., Ciapessoni, E., Cirio, D., Pitto, A., A detailed comparison of cumulant-based probabilistic power flow methods, (2012) International Review of Electrical Engineering (IREE), 7 (1), pp. 3562-3573.

M.Giuntoli, P.Pelacchi, D.Poli, On the use of simplified reactive power flow equations for purposes of fast reliability assessment, IEEE EUROCON 2013, Zagreb, Croatia, 1-4 July 2013.

S.Barsali, R.Giglioli, D.Poli, M.Sforna, R.Salvati, R.Zaottini, The restoration of an electric power system: international survey and possible innovative enhancements for the Italian system, Electric Power System Research, Vol.78 Issue 2, 2008.

H.Haroonabadi, M.Haghifam, Generation reliability assessment in power markets using Monte Carlo simulation and soft computing, Applied Soft Computing Journal, Vol.11 Issue 8, 2011.

Kamali, R., Stochastic based reactive power market in deregulated environment, (2011) International Review of Electrical Engineering (IREE), 6 (4), pp. 2020-2028.

G.Celli, E.Ghiani, G.Soma, F.Pilo, Active distribution network reliability assessment with a pseudo sequential Monte Carlo method, IEEE PES PowerTech, 2011.

M.Giuntoli, D.Poli, Optimized thermal and electrical scheduling of a Large Scale Virtual Power Plant in the presence of energy storages, IEEE Transactions on Smart Grid, Vol.4 Issue 2, 2013.

M.Brenna, M.C.Falvo, F.Foiadelli, L.Martirano, F.Massaro, D.Poli, A.Vaccaro, Challenges in Energy Systems for the Smart-Cities of the Future, 2012 IEEE International Energy Conference and Exhibition, ENERGYCON 2012, Florence.

Giglioli, R., Poli, D., Small-scale biomass-fired cogeneration, pellet production or district heating: New criteria for selecting the most profitable solution, (2013) International Review on Modelling and Simulations (IREMOS), 6 (3), pp. 782-794.

A.Srividya, V.Satchidanand, H. Ravikumar, Monte Carlo simulation based power system reliability evaluation, Proceedings of the American Power Conference, Vol.1, 1998.

A.Borghetti, M.Bosetti, S.Grillo, A.Morini, M.Paolone, F.Silvestro, A Two-Stage Scheduler of Distributed Energy Resources, IEEE Power Tech Conference, Lausanne, 2007.

S.Grillo, M.Marinelli, S.Massucco, F.Silvestro, Optimal Management Strategy of a Battery-Based Storage System to Improve Renewable Energy Integration in Distribution Networks, IEEE Transactions on Smart Grid, Vol. 3, no.2, 2012.

S.Massucco, A.Pitto, F.Silvestro, A gas turbine model for studies on distributed generation penetration into distribution networks, IEEE Transactions on Power Systems, Vol. 26, no.3, 2011.

S.Barsali, P.Pelacchi, D.Poli, A probabilistic criterion to set interconnection ratings, CIGRE 2004 Symposium, 4-6 April, 2004 - Ljubljana, Slovenia.

T.Baffa Scirocco, E.Fiorino, P.Pelacchi, D.Poli, A Monte Carlo technique for setting operating reserve margins under network constraints, PMAPS 2006, June 11-15, 2006, Stockholm.

D.Poli, P.Pelacchi, A probabilistic nodal analysis for helping the System Operator to validate the results of the day-ahead electricity market, Recent Researches in Energy and Environment - 6th IASME/WSEAS International Conference on Energy and Environment, EE'11 , Cambridge, 2011.

J.M.S.Pinheiro, C.R.R. Dornellas, M.Th. Schilling, AC.G. Melo, J.C.O. Mello, Probing The New IEEE Reliability Test System (RTS-96): HL-II Assessment, IEEE Transaction on Power Systems, Vol 13, No. 1, February 1998.

Giuntoli, M., Poli, D., A novel mixed-integer linear algorithm to generate unit commitment and dispatching scenarios for reliability test grids, (2011) International Review of Electrical Engineering (IREE), 6 (4), pp. 1971-1982.

R.Billinton, W.Li, Reliability assessment of Electric Power Systems Using Monte Carlo Methods (Plenum Press, New York, 1994).

W.Li, Risk Assessment of Power System: Model, Methods and Application (John Wiley and Son, Inc., 2005).


Refbacks

  • There are currently no refbacks.



Please send any question about this web site to info@praiseworthyprize.com
Copyright © 2005-2024 Praise Worthy Prize