Managing Software Project Risks (Design Phase) with Proposed Fuzzy Regression Analysis Techniques with Fuzzy Concepts


(*) Corresponding author


Authors' affiliations


DOI's assignment:
the author of the article can submit here a request for assignment of a DOI number to this resource!
Cost of the service: euros 10,00 (for a DOI)

Abstract


This Regardless how much effort we put for the success of software projects, many software projects have very high failure rate. Risk is not always avoidable, but it is controllable. The aim of this paper is to present the new mining technique that uses the fuzzy multiple regression analysis techniques with fuzzy concepts to managing the risks in a software project and reducing risk with software process improvement. Top ten software risk factors in design phase and thirty risk management techniques were presented to respondents.  The results show that all risks in software projects were important in software project manager perspective, whereas all risk management techniques are used most of time, and often. However, these mining tests were performed using fuzzy multiple regression analysis techniques to compare the risk management techniques to each of the software risk factors to determine if they are effective in mitigating the occurrence of each software risk factor by using statistical package for the Social Science (SPSS) for Manipulating and analyzing the data set, MATLAB 7.12.0 (R2011a), wolfram mathematic 9.0,. Also ten top software risk factors were mitigated by using risk management techniques except Risk 3 “Developing the Wrong User Interface”.  We referred the risk management techniques were mitigated on software risk factors in Table XV.  The study has been conducted on a group of software project managers. Successful project risk management will greatly improve the probability of project success
Copyright © 2013 Praise Worthy Prize - All rights reserved.

Keywords


Software Project Management; Software Risk Management; Design Phase; Software Risk Factors; Risk Management Techniques; Fuzzy Multiple Regression Analysis Techniques; Correlation Analysis; Statistical and Mining Techniques

Full Text:

PDF


References


S. Masticola, “A Simple Estimate of the Cost of Software Project Failures and the Breakeven Effectiveness of Project Risk Management,” 2007 First Int. Work. Econ. Softw. Comput., May 2007.

K. Schwalbe, Information Technology Project Management, Sixth. course technology,cengage learning, 2010, p. 490.

D. McNair, “Controlling risk,” Magazine Ubiquity, vol. 2001, no. January, ACM New York, NY, USA, 01-Jan-2001.

J. Miler, “P H D T HESIS A Method of Software Project Risk Identification and Analysis Jakub Miler,” GDAŃSK UNIVERSITY OF TECHNOLOGY, 2005.

J. Miler and J. Górski, “Supporting Team Risk Management in Software Procurement and Development Projects,” in 4th National Conference on Software Engineering, 2002.

C. R. Pandian, Applied software risk management: a guide for software project managers. Auerbach Publications is an imprint of the Taylor & Francis Group, an informa business, 2007, p. 246.

W. Ma, L. Liu, W. Feng, Y. Shan, and F. Peng, “Analyzing project risks within a cultural and organizational setting,” in 2009 ICSE Workshop on Leadership and Management in Software Architecture, 2009, pp. 6–14.

M. Keil, P. Cule, K. Lyytinen, and R. Schmidt, “Aframework for Identifying Software Project Risks,” Commun. ACM, vol. 41, no. 11, 1998.

L. Rodriguez-Repisoa, R. Setchib, and J. Salmeronc, “Modelling IT projects success: Emerging methodologies reviewed,” Technovation, vol. 27, no. 10, pp. 582–594, Oct. 2007.

H.-G. Chen, J. J. Jiang, G. Klein, and J. V. Chen, “Reducing software requirement perception gaps through coordination mechanisms,” J. Syst. Softw., vol. 82, no. 4, pp. 650–655, Apr. 2009.

J. Hoffer, J. George, and J. Valacich, Modern Systems Analysis and Design, 6th ed. Prentice Hall, 2011, p. 575.

J. Taylor, Managing Information Technology Projects: Applying Project Management Strategies to Software, Hardware, and Integration Initiatives. AMACOM © 2004, 2004, p. 274.

J. Sodhi and P. Sodhi, IT Project Management Handbook. Management Concepts, 2001, p. 264.

B. Boehm, “Value-based software engineering,” ACM SIGSOFT Softw. Eng. Notes, vol. 28, no. 2, p. 3, Mar. 2003.

A. Ezamly and B. Hussin, “Estimating Quality-Affecting Risks in Software Projects,” Int. Manag. Rev. , Am. Sch. Press, vol. 7, no. 2, pp. 66–83, 2011.

D. Houston, G. Mackulak, and J. Collofello, “Stochastic simulation of risk factor potential effects for software development risk management,” J. Syst. Softw., vol. 59, no. 3, pp. 247–257, Dec. 2001.

E. W. T. Ngai and F. K. T. Wat, “Fuzzy decision support system for risk analysis in e-commerce development,” Decis. Support Syst., vol. 40, no. 2, pp. 235–255, Aug. 2005.

J. Miler and J. Górski, “Implementing risk management in software projects,” in 3rd National Conference on Software Engineering, 2001.

P. Savolainen, J. Ahonen, and I. Richardson, “Software development project success and failure from the supplier ’ s perspective: A systematic literature review,” Int. J. Proj. Manag., p. 12, 2011.

J. Miler and J. Górski, “Identifying Software Project Risks with the Process Model,” in proc. of 17th International Conference “Software & Systems Engineering and their Applications,” 2004, no. 4, pp. 1–9.

J. Liu, H.-G. Chen, C. Chen, and T. Sheu, “Relationships among interpersonal conflict, requirements uncertainty, and software project performance,” Int. J. Proj. Manag., vol. 29, no. 5, pp. 547–556, Jun. 2011.

Z. Begum, M. S. A. Khan, M. Hafiz, M. S. Islam, and M. Shoyaib, “Sofware Development Standard and Software Engineering Practice: A Case Study of Bangladesh,” J. Bangladesh Acad. Sci., vol. 32, no. 2, pp. 131–139, May 2008.

K. Khanfar, A. Elzamly, W. Al-Ahmad, E. El-Qawasmeh, K. Alsamara, and S. Abuleil, “Managing Software Project Risks with the Chi-Square Technique,” Manage. Rev., vol. 4, no. 2, pp. 18–29, 2008.

A. Elzamly and B. Hussin, “Managing Software Project Risks with Proposed Regression Model Techniques and Effect Size Technique,” Int. Rev. Comput. Softw., vol. 6, no. 2 March, pp. 250–263, 2011.

A. Elzamly and B. Hussin, “Managing Software Project Risks ( Implementation Phase ) with Proposed Stepwise Regression Analysis Techniques,” Int. J. Inf. Technol., vol. 1, no. 4, 2013.

T. Addison and S. Vallabh, “Controlling Software Project Risks – an Empirical Study of Methods used by Experienced Project Managers.,” in Proceedings of SAICSIT, 2002, pp. 128 – 140.

G. Büyüközkan and D. Ruan, “Choquet integral based aggregation approach to software development risk assessment,” Inf. Sci. (Ny)., vol. 180, no. 3, pp. 441–451, Feb. 2010.

R. Dash and R. Dash, “Risk Assessment Techniques for Software Development,” Eur. J. Sci. Res., vol. 42, no. 4, pp. 629–636, 2010.

D. Galorath and M. Evans, Software Sizing, Estimation, and Risk Management. Auerbach Publications, 2006, p. 541.

X. Lu and Q. Ma, “Risk analysis in software development project with owners and contractors,” IEEE Int. Eng. Manag. Conf., vol. 4, pp. 789–793, 2004.

T. Merna and F. Al-Thani, Corporate Risk Management and Optimal Hedging Disclosure, Second. John Wiley and Sons, 2008.

T. Aven, Risk Analysis: Assessing Uncertainties Beyond Expected Values and Probabilities. John Wiley & Sons , Inc., 2008, p. 204.

M. Fan, N.-P. Lin, and C. Sheu, “Choosing a project risk-handling strategy: An analytical model,” Int. J. Prod. Econ., vol. 112, no. 2, pp. 700–713, Apr. 2008.

J. Hallows, Information Systems Project Management: How to Deliver Function and Value in Information Technology Projects, Secondi. AMACOM, 2005, p. 304.

B. Boehm, “Software Risk Management: Principles and Practices,” Management, no. January, 1991.

J. Deng and Y. Bian, “Constructing a Risk Management Mechanism Model of ERP Project Implementation,” in 2008 International Conference on Information Management, Innovation Management and Industrial Engineering, 2008, pp. 72–77.

J. Walewski, “International Project Risk Assessment: Methods , Procedures , and Critical Factors,” 2003.

John Horch, Practical Guide to Software Quality Management. ARTECH HOUSE, INC., 2003, p. 286.

Oracle, “A Standardized Approach to Risk Improves Project Outcomes and Profitability,” 2010.

P. Bannerman, “Risk and risk management in software projects: A reassessment,” J. Syst. Softw., vol. 81, no. 12, pp. 2118–2133, Dec. 2008.

T. S. G. 1995 CHAOS, “THE STANDISH GROUP REPORT The Standish Group 1995. Reprinted here for sole academic purposes with written permission from The Standish Group. CHAOS,” 29/2/2012, 1995. .

T. Addison, “E-commerce project development risks : evidence from a Delphi survey 1,” Int. J. Inf. Manage., vol. 23, no. June 2001, pp. 25–40, 2003.

D. Aloini, R. Dulmin, and V. Mininno, “Risk management in ERP project introduction: Review of the literature,” Inf. Manag., vol. 44, no. 6, pp. 547–567, Sep. 2007.

W.-M. Han and S.-J. Huang, “An empirical analysis of risk components and performance on software projects,” J. Syst. Softw., vol. 80, no. 1, pp. 42–50, Jan. 2007.

S.-J. Huang and W.-M. Han, “Exploring the relationship between software project duration and risk exposure: A cluster analysis,” Inf. Manag., vol. 45, no. 3, pp. 175–182, Apr. 2008.

B. Aritua, N. J. Smith, and D. Bower, “What risks are common to or amplified in programmes: Evidence from UK public sector infrastructure schemes,” Int. J. Proj. Manag., vol. 29, no. 3, pp. 303–312, Jun. 2010.

R. O. Y. Schmidt, K. Lyytinen, M. Keil, and P. Cule, “Identifying Software Project Risks: An International Delphi Study,” J. tjf Manag. Inf. Syst. /Spring, vol. 17, no. 4, pp. 5–36, 2001.

R. Nakatsu and C. Iacovou, “A comparative study of important risk factors involved in offshore and domestic outsourcing of software development projects: A two-panel Delphi study,” Inf. Manag., vol. 46, no. 1, pp. 57–68, Jan. 2009.

J.-C. Chen and S.-J. Huang, “An empirical analysis of the impact of software development problem factors on software maintainability,” J. Syst. Softw., vol. 82, no. 6, pp. 981–992, Jun. 2009.

M. Keil, A. Tiwana, and A. Bush, “Reconciling user and project manager perceptions of IT project risk: a Delphi study 1,” Inf. Syst. J., no. April 1999, pp. 103–119, 2002.

L. Wallace, M. Keil, and A. Rai, “How Software Project Risk Affects Project Performance: An Investigation of the Dimensions of Risk and an Exploratory Model,” Decis. Sci., vol. 35, no. 2, 2004.

M. Sumner, “Risk factors in enterprise-wide/ERP projects,” J. Inf. Technol., vol. 15, no. 4, pp. 317–327, Dec. 2000.

B. Boehm and R. Ross, “Theory-W Software Project Management: Princioles and Examples,” vol. 15, no. 7, pp. 902–916, 1989.

Kweku Ewusi-Mensah, Software Development Failures: Anatomy of Abandoned Projects. The MIT Press, 2003, p. 276.

G. Paré, C. Sicotte, M. Jaana, and D. Girouard, “Prioritizing Clinical Information System Project Risk Factors : A Delphi Study,” in Proceedings of the 41st Hawaii International Conference on System Sciences -, 2008, pp. 1–10.

B. Lawrence, K. Wiegers, and C. Ebert, “The Top Risks of Requirements Engineering,” 2001.

D. Shafer and C. Officer, “Software Risk: Why must we keep learning from experience? Where does Risk Occur in DP Software Development?,” in DYNAMIC POSITIONING CONFERENCE, 2004, pp. 1–19.

H. Hoodat and H. Rashidi, “Classification and Analysis of Risks in Software Engineering,” Eng. Technol., vol. 56, pp. 446–452, 2009.

C. Jones, G. Glen, G. Anna, and D. Miller, “Strategies for improving systems development project success,” Issues Inf. Syst., vol. XI, no. 1, pp. 164–173, 2010.

C. Jones, Applied Software Measurement Global Analysis of Productivity and Quality, Third Edit., no. Third Edition. McGraw-Hill Companies., 2008, p. 662.

A. Taimour, “Why IT Projects Fail,” 2005.

M. Faktor, K. Kritikal, and K. Terjadinya, “Determining the Critical Success Factors of Oral Cancer Susceptibility Prediction in Malaysia Using Fuzzy Models,” Sains Malaysiana, vol. 41, no. 5, pp. 633–640, 2012.

Y.-L. Chen and C.-H. Weng, “Mining association rules from imprecise ordinal data,” Fuzzy Sets Syst., vol. 159, no. 4, pp. 460–474, Feb. 2008.

J.-G. Lin, Q.-Y. Zhuang, and C. Huang, “Fuzzy Statistical Analysis of Multiple Regression with Crisp and Fuzzy Covariates and Applications in Analyzing Economic Data of China important,” Comput. Econ., vol. 39, no. 1, pp. 29–49, 2012.

X. Gu, G. Song, and L. Xiao, “Design of a Fuzzy Decision-making Model and Its Application to Software Functional Size Measurement,” in nternational Conference on Computational Intelligence for Modelling Control and Automation,and International Conference on Intelligent Agents,Web Technologies and Internet Commerce (CIMCA-IAWTIC’06), 2006.

Y.-L. Chen and C.-H. Weng, “Mining fuzzy association rules from questionnaire data,” Knowledge-Based Syst., vol. 22, no. 1, pp. 46–56, Jan. 2009.

V. Marza and M. A. Seyyedi, “Fuzzy Multiple Regression Model for Estimating Software Development Time,” International Journal of Engineering Business Management, vol. 1, no. 2, pp. 31–34, 2009.

K. Aali, M. Parsinejad, and B. Rahmani, “Estimation of Saturation Percentage of Soil Using Multiple Regression ,ANN, and ANFIS Techniques,” Comput. Inf. Sci., vol. 2, no. 3, pp. 127–136, 2009.

W. Ir.Wahidin, “Chapt3 Membership Function,” in in knowledge based systems, 2009.

C. Popescu and M. Giuclea, “A MODEL OF MULTIPLE LINEAR REGRESSION,” Publ. house Rom. Acad., vol. 8, no. 2, pp. 1–8, 2007.

R. Buckley and J. Caple, The Theory & Practice of Training, 6th editio. kogan page London and Philadelphia, 2009, p. 369.

T. Clancy, “The standish group report,” 1995.

D. Surie, “Evaluation and Integration of Risk Management in CMMI and ISO / IEC 15504,” in 8th Student Conference in Computing Science, Umeå, Sweden, May 28, 2004, 2004, p. 14.

E. Bennatan, Catastrophe Disentanglement: Getting Software Projects Back on Track. Addison Wesley Professional, 2006, p. 288.

B. Boehm and V. Basili, “Software Defect Reduction Top 10 List,” 2001.

A. Maglyas, “EVALUATING THE SUCCESS OF SOFTWARE DEVELOPMENT PROJECTS IN RUSSIA , UKRAINE , AND BELARUS,” LAPPEENRANTA UNIVERSITY OF TECHNOLOGY FACULTY OF TECHNOLOGY MANAGEMENT, 2009.

B. Boehm, “USC CSSE Workshop Overview: Top 3 Software-Intensive Systems Risk Items,” 2007.

R. Selby, Software Engineering: Barry W. Boehm’s Lifetime Contributions to Software Development, Management, and Research (Practitioners), 1 edition. Wiley-IEEE Computer Society, 2007, p. 832.

R. Fairley, MANAGING AND LEADING SOFTWARE PROJECTS. A JOHN WILEY & SONS, INC., 2009, p. 492.

C. Rudd, Planning to Implement Service Management ( PISM ), First., no. March. TSO (The stationery office), 2010, p. 305.

A. Ahmed, Software Project Management: A Process-Driven Approach, 1 edition. Auerbach Publications, 2011, p. 456.

G. Britain, Public Accounts Committee The National Offender Management Information System, no. June. Parliament: House of Commons: Committee of Public, 2009, p. 41.

K. Yogesan, P. Brett, and M. Gibbons, Handbook of Digital Homecare Series in Biomedical Engineering. Springer-Verlag Berlin Heidelberg, 2009, p. 366.


Refbacks

  • There are currently no refbacks.



Please send any question about this web site to info@praiseworthyprize.com
Copyright © 2005-2024 Praise Worthy Prize