Congestion and overloads in transmission lines always is one of the basic problems in the power system operation. Some of the consequences of this problem in the restructured power system are sudden price increasing in some areas, increase in market power and reduction in the competition in the market. FACTS devices as an efficient, powerful and economical means can have a key role in transmission line congestion management. Locating and parameters setting of the FACTS devices is very important to achieve the desired objectives. For optimal setting and determining the appropriate location of FACTS devices for congestion management, a method based on the locational marginal price (LMP) and optimal power flow (OPF) in combination with FACTS devices is used. In this paper, TCSC and TCPST have been used in the congestion management. This method is applied on IEEE 14 and 30 bus systems. Simulation results show the effect of FACTS devices appropriate locating on the reduction of the total restructured power system costs
Copyright © 2013 Praise Worthy Prize - All rights reserved.
Full Text:
PDFReferences
R.D. Christie, B.F. Wollenberg and I. Wangstien, “Transmission management in the deregulated environment,” in Proc. IEEE, vol. 88, No. 2, Feb. 2000, pp. 170-195.
Ashwani Kumar, S.C. Srivastava, and S. N. Singh, “Congestion management in competitive power markets-A bibliographical survey”, International Journal of Electric Power System and Research vol. 76, pp. 153-164, July 2005
K.S. Verma, S.N. Singh, H.O. Gupta, “Location of unified power flow controller for congestion management”, Electric Power Systems Research 58 (2001) 89–96
S.N. Singh, A.K. David, “Optimal location of FACTS devices for congestion management”, Electric Power Systems Research 58 (2001) 71–79
Kwang-Ho Lee , “Optimal siting of TCSC for reducing congestion cost by using shadow prices”, Electrical Power and Energy Systems 24 (2002) 647–653
Idris, R.M., Khairuddin, A., Mustafa, M.W., Kalam, A., Optimal allocation of multi-type FACTS devices using bees algorithm for ATC enhancement in deregulated power system, (2010) International Review of Electrical Engineering (IREE), 5 (2), pp. 644-651.
Sarvi, M., Sedighizadeh, M., Qarebaghi, J., Optimal location and parameters setting of UPFC based on particle swarm optimization for increasing loadability, (2010) International Review of Electrical Engineering (IREE), 5 (5), pp. 2234-2240.
Masoum, M.A.S., Nabavi, S.M.H., Kazemi, A., Social welfare maximization in double-sided auction market by placement and sizing of TCSC using fuzzy-based genetic algorithm, (2010) International Review of Electrical Engineering (IREE), 5 (5), pp. 2392-2404.
Sarvi, M., Sedighizadeh, M., Bagheri, A.A., TTC enhancement through optimal location of FACTS devices using particle swarm optimization, (2011) International Review of Electrical Engineering (IREE), 6 (1), pp. 324-331.
Nabavi, S.M.H., Hajforosh, S., Hajforoosh, S., Karimi, A., Locating and sizing static synchronous series compensator using fuzzy-genetic algorithm, (2011) International Review of Electrical Engineering (IREE), 6 (3), pp. 1425-1438.
G.M. Huang, P. Yan, “Establishing pricing schemes for FACTS devices in congestion management”, Power Engineering Society General Meeting, 2003, IEEE 13-17 July 2003
L. Yao, P. Cartwright, L. Schmitt, X.-P. Zhang, “Congestion Management of Transmission Systems Using FACTS”, Transmission and Distribution Conference and Exhibition: Asia and Pacific, 2005 IEEE/PES, 2005
V.Z. Farahani, A. Kazemi, A.B. Majd, “Congestion management in bilateral based power market by FACTS devices and load curtailments”, Power India Conference, 2006 IEEE
A. Kazemi, R. Sharifi, “Optimal Location of Thyristor Controlled Phase Shifter in Restructured Power Systems By Congestion Management”, Industrial Technology, 2006. ICIT 2006. IEEE International Conference on, 15-17 Dec. 2006
Naresh Acharya, Nadarajah Mithulananthan, “Influence of TCSC on congestion and spot price in electricity market with bilateral contract”, Electric Power Systems Research 77 (2007) 695–703
Hadi Besharat, Seyed Abbas Taher, “Congestion management by determining optimal location of TCSC in deregulated power systems”, Electrical Power and Energy Systems 30 (2008) 563–568
R.S. Wibowo, N. Yorino, M. Eghbal, Y. Zoka, “FACTS devices allocation for congestion management considering voltage stability by means of MOPSO (FACTS)”, IEEE T&D Asia 2009
Sajad Rahimzadeh, Mohammad Tavakoli Bina, “Looking for optimal number and placement of FACTS devices to manage the transmission congestion”, Energy Conversion and Management 52 (2010) 437–446
Singh SN, David AK. Placement of FACTS devices in open power market. Adv Power Syst Control Operation Manage 2000;1:173–7.
E. J. Oliveira, J. W. M. Lima, and K. C. Almeida, "Allocation of FACTS devices in hydrothermal system," IEEE Trans. Power Systems, vol. 15, pp. 276-282, February. 2000.
F.L. Alvarado, “Controlling Power Systems with Price Signals,” Decision Support Syst., vol. 40, 2005, pp. 495–504.
Power System Test Case Achieves, Retrieved 10December 2004. From http://wwwee.washington.edu/research/pstca