Risk Management Framework for Construction of Marine Projects in Egypt Using Python Method


(*) Corresponding author


Authors' affiliations


DOI: https://doi.org/10.15866/irece.v15i1.23530

Abstract


Construction projects are thought of as exceedingly complex projects with a great deal of uncertainty. Some serious risks and uncertainties frequently result in cost overruns and completion delays. Due to the huge scope of the marine business, marine construction is growing nowadays. The studies show that it is impossible to eliminate risk and uncertainty in the building industry, especially in marine projects. The primary goal of this paper is to locate and assess potential risks related to the development of marine construction in Egypt. This paper uses a structured questionnaire to achieve its objectives. Thirty factors of risk have been found, described, and classified into five main categories according to their sources. The statistical application SPSS and intelligent techniques such as Python are utilized to identify risk factors with high severity. The outcomes show that the top 10 risk factors are as follows: Change of management team and joint ventures, Changes in legislations, regulations, and code of practices, Poor monitoring from the owner, Poor inclement weather conditions, Fluctuations greater than estimated values, Late information or site instructions by technicians, Levelized cost of energy, Delay in the availability of shop drawings, High tides, and Equipment failure.
Copyright © 2024 Praise Worthy Prize - All rights reserved.

Keywords


Marine Construction; Mitigation Actions; Python; Questionnaire; Risk Factors

Full Text:

PDF


References


C. Atapattu, N. Domingo and M. Sutrisna, Causes and Effects of Cost Overruns in Construction Projects, in Proceedings of the 45th AUBEA Conference, Western Sydney University, Australia, 2022.

S. Alshihri, K. Al-Gahtani, and A. Almohsen, Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia, Buildings, vol. 12, no. 902, 2022.
https://doi.org/10.3390/buildings12070902

S. Sankar and K. Shashikanth, Risk Management in Construction Industry, International Journal of Research Publication and Reviews, vol. 3, no. 5, pp. 3008-3017, 2022.
https://doi.org/10.55248/gengpi.2022.3.5.17

M. Gebrel, K. Assaf, M. Farag, and A. Mohamed, Causes of Delay and Cost Overruns for Educational Building Projects in Egypt, Journal of Engineering Sciences Assiut University, vol. 49, no. 4, pp. 577 - 596, 2021.
https://doi.org/10.21608/jesaun.2021.69258.1044

V. Tam and L. Shen, Risk management for contractors in marine projects, Organization, Technology and Management in Construction: An International Journal, vol. 4, no. 1, pp. 403-410, 2012.
https://doi.org/10.5592/otmcj.2012.1.5

O. Gudmestad, Weather Restrictions Posed on Marine Operations in the Barents Sea, Advanced Aspects of Engineering Research, vol. 2, pp. 107-119, 2021.
https://doi.org/10.9734/bpi/aaer/v2/7558D

S. Schuldt, M. Nicholson, Y. Adams, and J. Delorit, Weather-Related Construction Delays in a Changing Climate: A Systematic State-of-the-Art Review, Sustainability, vol. 13, no. 2861, 2021.
https://doi.org/10.3390/su13052861

R. Bahamid, S. Doh, M. Al-Sharafi, and A. Rahimi, Risk Factors Influencing the Construction Projects in Yemen from Expert's Perspective, IOP Conf. Series: Materials Science and Engineering, vol. 712, no. 012007, 2020.
https://doi.org/10.1088/1757-899X/712/1/012007

M. Memon, N. Abas and S. Sohu, Ranking the critical causes of accidents in construction projects of Sindh: Perspective of safety professionals, IOP Conf. Series: Earth and Environmental Science, vol. 1205, no. 012035, 2023.
https://doi.org/10.1088/1755-1315/1205/1/012035

N. Al-Nassafi, The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait, Journal of Asian Finance, Economics and Business, vol. 9, no. 3, pp. 53-63, 2022.

Y. Alfraidi, S. Alzahrani, F. Binsarra, M. Abdelhafez, E. Noaime, and M. Mohamed, Impact of political risk on construction cost in PPP project in KSA, International Journal of Advanced and Applied Sciences, vol. 7, no. 5, pp. 6-11, 2020.
https://doi.org/10.21833/ijaas.2020.05.002

Y. Wang, B. Pang, X. Zhang, J. Zhang, Y. Liu, C. Shi and S. Zhou, Life Cycle Environmental Costs of Buildings, Energies, vol. 13, no. 1353, 2020.
https://doi.org/10.3390/en13061353

G. Makebo and E. Basa, Causes and Effect of Design Change on Building Construction Project: Review, International Journal of Advance Research and Innovative Ideas in Education, vol. 6, no. 3, pp. 1527-1531, 2020.

N. Danial and M. Misnan, Possession of Site: Another Layer of Complexity in Road Construction, Sustainability, vol. 14, no. 6809, 2022.
https://doi.org/10.3390/su14116809

Z. Ishaq, M. Abubakar, S. Muhammad, Y. Lawal, and A. Ibrahim, Impact of Risk Factors on Construction Projects' Completion Cost in Nigeria, LAUTECH Journal of Civil and Environmental Studies, vol. 6, no. 2, pp. 78-89, 2021.
https://doi.org/10.36108/laujoces/1202.60.0270

R. Bahamid, S. Doh, M. Khoiry, M. Kassem and M. Al-Sharafi, The Current Risk Management Practices and Knowledge in the Construction Industry, Buildings, vol. 12, no. 1016, 2022.
https://doi.org/10.3390/buildings12071016

E. Yousri, A. Sayed, M. Farag, and A. Abdelalim, Risk Identification of Building Construction Projects in Egypt, Buildings, vol. 13, no. 1084, 2023.
https://doi.org/10.3390/buildings13041084

H. Ghaeb and A. Mahjoob, Risk Response in Construction Project: A Review Study, Journal of Engineering, vol. 29, no. 8, 2023.
https://doi.org/10.31026/j.eng.2023.08.09

M. Seiso, B. Ogunbayo, and C. Aigbavboa, Joint Ventures in the South African Construction Industry: Factors Militating against Success, Buildings, vol. 13, no. 1299, 2023.
https://doi.org/10.3390/buildings13051299

A. Alsharef, E. Jaselskis, A. Mostafavi, J. Zhu, R. Stoa, S. Banerjee, K. Rasoulkhani, Q. Li and S. Chowdhury, Assessing the Impact of Regulatory Changes on Capital Projects in the United States, in CIB World Building Congress, Hong Kong SAR, China, 2019.

E. Banobi and W. Jung, Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects, Sustainability, vol. 11, no. 5973, 2019.
https://doi.org/10.3390/su11215973

E. OLA-ADE, Minimising Variations and Fluctuations in Housing Delivery in the Developing Economy of Nigeria, in FIG e-Working Week 2021 "Smart Surveyors for Land and Water Management - Challenges in a New Reality", Netherlands, 2021.

A. Gamage, Importance of Effective Communication to Minimize Disputes in Construction Projects, Scholars Journal of Engineering and Technology, vol. 10, no. 7, pp. 128-140, 2022.
https://doi.org/10.36347/sjet.2022.v10i07.002

M. Krechowicz and J. Piotrowski, Comprehensive Risk Management in Passive Buildings Projects, Energies, vol. 14, no. 6830, 2021.
https://doi.org/10.3390/en14206830

M. Kamal, S. Dokhan and K. El-Dash, Assessing the Impact of Delay of Shop Drawing Process in Construction Projects, Engineering Research Journal (ERJ), vol. 51, no. 4, pp. 161-180, 2022.
https://doi.org/10.21608/erjsh.2022.155645.1072

M. Kaup, D. Łozowicka, K. Baszak, W. Slaczka and A. Kalbarczyk-Jedynak, Risk Analysis of Seaport Construction Project Execution, Appl. Sci., vol. 12, no. 8381, 2022.
https://doi.org/10.3390/app12168381

B. Indhu and K. Yogeswari, Review on Delay Factors due to Improper Construction Equipment Management, International Journal on Emerging Technologies, vol. 11, no. 1, pp. 209-214, 2020.

S. Banihashemi, M. Khalilzadeh, E. Zavadskas, and J. Antucheviciene, Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision Making Method, Sustainability, vol. 13, no. 10922, 2021.
https://doi.org/10.3390/su131910922

S. Zain, A. Abdul Hamid, A. Bah, Z. Hatem, A. Ba-Hutair, B. Zadran, N. Abba and M. Islam, Ineffective Site Management Practices and Their Impacts on Project Performance., The 6th Proceeding of Civil Engineering (pp.501-518), 2021.

A. Fromsa, W. Ararsa, and E. Quezon, Effects of Poor Workmanship on Building Construction and Its Implication to Project Management Practice: A Case Study in Addis Ababa City, Journal of Xidian University, vol. 14, no. 9, pp. 1174-1188, 2020.
https://doi.org/10.37896/jxu14.9/128

B. Obonadhuze, C. Eze, L. Siunoje and O. Siunoje, Causes and Effects of Ineffective Communication on Construction Projects, Borneo Journal of Sciences & Technology, vol. 3, no. 1, pp. 77-92, 2021.

Al-Shammaa, A., Al-Qaisee, G., Al-Hamami, B., Advantages of Using Inverted T-Sections to Construct Cantilever RC Beams, (2023) International Review of Civil Engineering (IRECE), 14 (4), pp. 340-347.
https://doi.org/10.15866/irece.v14i4.23337

Noorwali, A., Yengui, A., Alzurqui, A., Ammous, K., Ammous, A., Wireless ECG Monitor Design Based on Raspberry Pi3 and AD8232 Microchip, (2022) International Review of Electrical Engineering (IREE), 17 (1), pp. 89-98.
https://doi.org/10.15866/iree.v17i1.21152

Banerjee, D., Putta, J., Rao P., R., Heuristic Driven Hybrid Analytical-Artificial Intelligence Concept for Risk Prediction in Construction Megaprojects, (2021) International Review of Civil Engineering (IRECE), 12 (6), pp. 398-417.
https://doi.org/10.15866/irece.v12i6.20864

Stadnicka, D., Habrat, D., Daź, W., Habrat, W., Technical and Legal Relations in Aviation Industry from Technology Management and Sustainability Perspective, (2022) International Review of Aerospace Engineering (IREASE), 15 (1), pp. 24-35.
https://doi.org/10.15866/irease.v15i1.20755


Refbacks

  • There are currently no refbacks.



Please send any question about this web site to info@praiseworthyprize.com
Copyright © 2005-2024 Praise Worthy Prize