Informatics Approach to Innovative Site Management Practices for Improving Construction Works


(*) Corresponding author


Authors' affiliations


DOI: https://doi.org/10.15866/irece.v12i2.18812

Abstract


Worldwide, the construction industry is currently experiencing dynamics in innovations, particularly in managing construction sites. The dynamic nature of operations and procedure has necessitated a change in traditional practices' paradigm to conventional techniques. To this end, this study aims to introduce new strategies that could improve management practices on projects in order to enhance project productivity and performance. A literature review has been conducted in order to establish the gaps in research already carried out, while the emerging gaps have formed the core of the research questions used for the study. A survey design has been used while the population frame of 150 construction firms has been adopted. In addition, 80 respondents that constitute professionals that work in the firms have been picked randomly for the study. Some tests like Chi-square test, Student-T test, Man-Whitney U test, simple percentage, and agreement index have been used to process the data. The following variables have been censored, analyzed, and discussed: the prevailing construction practice, the management practices of construction firms, success factors that influence efficient adoption of site management practices, problem or hindrance associated with some selected site management practices, merit in engaging management tools in construction operation management, construction professional's perspective on strategies to improve construction management practices for effective deployment, new innovations that could enhance and complement existing management practice, the barriers to effective deployment of the innovative methods. In conclusion, this study has developed new innovative strategies that could be used on-site and framework of application in the form of a site logic regression model. Most of the parameters of the model are client-project-stakeholders oriented, for instance. Some of them include resources synergy oriented procurement route, adopting a user performance expectation oriented procurement system at all the phases of the project, consultative decision approach by management, collaborative decision process, and adopting key performance indicator based procurement system. The consultative decision-taking approach entails the consultative decision taking on consulting with relevant stakeholders before taking a position on an issue. It allows the management to have workers' welfare and interest at heart while taking the decision. This is pointing to the fact that an inclusive system would be an ideal system when output is the design and model based on users' requirements. This would enable the user of a system to model a product based on their performance expectation. This study recommends the application of the new ideas suggested as a panacea to enhanced site productivity.
Copyright © 2021 Praise Worthy Prize - All rights reserved.

Keywords


Informatics; Innovation; Performance; Collaboration; Synergy; Strategy; Operation

Full Text:

PDF


References


Olanrewaju, A. L., & Abdul-Aziz, A. R. (2015). Building Maintenance Processes, Principles, Procedures, Practices, and Strategies. In Building Maintenance Processes and Practices. Springer. Singapore. June 2015. Pp.79-129.
https://doi.org/10.1007/978-981-287-263-0_5

Janakootalova, Liberma, and Tetrevova (2014) Towards Improving Site Management. Procedia Social and Behavioral Sciences.150C Page 678-689.

Shenhar and Dvir (2007) In search of project classification: a non-universal approach to project success factors, Research Policy, 27(9): 915-925.
https://doi.org/10.1016/s0048-7333(98)00085-7

Ugwu and Attah(2016) Ugwu, O. O. and Haupt T. C., Key Performance Indicators and Assessment Methods for Infrastructure Sustainability - A South African Construction Industry Perspective, Building & Environment, Vol. 42, Number 2, 2007, pp. 665
https://doi.org/10.1016/j.buildenv.2005.10.018

Frimpong, Oluwoye, and Crawford (2004) Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study, International Journal of Project Management, Vol. 21, Number 5, pp.45
https://doi.org/10.1016/s0263-7863(02)00055-8

Carrillo, P. and Chinowsky, P (2006) Exploiting Knowledge Management: The Engineering and Construction Perspective. Journal of Management in Engineering, Vol. 22, No. 1, pp. 2-10.

Pinto, J.K. and Slevin, D.P. Critical success factors in R&D projects, Research-Technology Management, 1989, 32(1): pp.31-35

Kavanagh, D. and Naughton, E. (2009) Innovation & project management – exploring the links, PM World Today, 2009, vol. XI, issue IV, pp. 1-7

Proverbs, DG, Holt, G D and Cheok, H Y (2000) construction industry problems; the views of UK construction directors. In; Akintoye, A (Ed.), 16th annual ARCOM conference, 6-8 September 2000, Glasgow Caledonian University. Association of researchers in construction management, vol.1, 73-81

Creswel John.W (2016) Reflection on the MMIRA The Future of Mixed Methods Task Force Report. Journal of Mixed Method Research. Pg45-65.

Osiyevskyy, O., Dewald, J. (2015), Explorative versus exploitative business model change: The cognitive antecedents of firm-level responses to disruptive innovation. Strategic Entrepreneurship Journal, 9(1), pp.58-78.
https://doi.org/10.1002/sej.1192

Sudhir, Chitnis, Nehal, Despande, and Arvind (2016) An Investigative Study For Smart Home Security: Issues, Challenges, and Countermeasure. Wireless Sensor Network. 8(4). Pp. 65-69. Pp 491-506.

Tangkar Martino and Arditi David (2000) Innovation in the Construction Industry. Dimensi Teknik Sipil, Vol. 2, No. 2, September 2000, Hal. 96 – 103.

Serpell, A., and Ferrada, X. (2006). A Competency Framework for Construction Supervisors in Developing Countries. CIB W107 Construction in Developing Countries International Symposium. 18 – 20 January 2006, Santiago, Chile. (10). pp.234-245.
https://doi.org/10.1108/00483480710752812

Hughes (2010), Hughes, W. P. (2010) Built environment education, research, and practice: Integrating diverse interests to make an impact In Laryea, S., Leininger, R. and Hughes, W. (Eds) Procs West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, pp.1-8.

Marjasalo, A., Koskenvesa, A., Tolonen, T., and Koskela, L. (2011). Time Allocation of Site Management. Proceedings of the 19th Annual Meeting of the International Group for Lean Construction. Lima, Peru. pp.124-138.

Nitithamyong and Skibniewski (2004), Web-based construction management project systems: how to make them successful? Automation in Construction. Vol. 13, pp.10-25.
https://doi.org/10.1016/j.autcon.2004.02.003

Hirano, H. (1995). 5 Pillars of the Visual Workplace. Productivity. Cambridge Press. 3rd Edition. pp13-19.

Arnaboldi, Azzone and Savoldelli (2004) Managing public sector project: the case of the Italian Treasury Ministry. International Journal of Project management, Vol. 22, Number 3, 2004, pp 213-223.
https://doi.org/10.1016/s0263-7863(03)00067-x

Robinson (2004), Robbins, ST, and Coulter, M. (2007). Management (8th Edition). UK; Prentice Hall. Pp..21-35.

Arnaboldi, Azzone and Savoldelli (2004) Managing public sector project: the case of the Italian Treasury Ministry. International Journal of Project management, vol. 22, Number 3, 2004, pp 213-223.
https://doi.org/10.1016/s0263-7863(03)00067-x

Amusan, M. Lekan, Clinton Aigbavboa, Aremu J. Adekunle & Adediran C. Ayodele (2020) Developing Sustainable Urban-Rural Housing System: Formulating Implementation Framework Using Block Diagram And Heuristic Algorithm System. International Journal of Mechanical and Production Engineering Research and Development (IJMPERD) ISSN (P): 2249–6890; ISSN (E): 2249–8001 Vol. 10, Issue 3, Jun 2020, pp.3429-3438
https://doi.org/10.24247/ijmperdapr20188

Amusan Lekan, Andrew Shalem Ashiga, Emetere Moses Eterigho, Ojelabi Raphael Abiodun (2020) Mechanically Induced-Sound Approach to Producing Alternative Electricity. Boreal Environment Research Journal. 25[7}. Pp. 2-25.

Hasan M.F, and Mohammed M.S (2018). Time Overrun Model for Construction Projects in Iraq by Using Fuzzy Logic. International Journal of Civil Engineering and Technology, Vol. 9 (Issue 11): 2593–2607.

Hamid, W., Waterman, A., Analysis of the Main Causes of Cost Overruns in Construction Industry in Developing Countries and the UK, (2018) International Review of Civil Engineering (IRECE), 9 (3), pp. 105-113.
https://doi.org/10.15866/irece.v9i3.14525

Taraziya, R., Abd Ali, R., Survey on the Most Significant Factors Affecting the Delivery Process of Construction Activities During Execution Phase in Iraq, (2020) International Review of Civil Engineering (IRECE), 11 (3), pp. 114-120.
https://doi.org/10.15866/irece.v11i3.17700

Aswed, G., Mohammed, H., Ahmed, M., Factors Affecting Safety in Construction Projects, (2020) International Review of Civil Engineering (IRECE), 11 (3), pp. 135-140.
https://doi.org/10.15866/irece.v11i3.17142

Taufik Dwi Laksono (2019) Causes of Cost Overruns in Construction Industry International Journal of Civil Engineering and Technology. vol 10(5), pp.117-120.

Dewa Ketut Sudarsana, Putu Ari Sanjaya (2019), Development of Delay Claim with a Traffic Volume Approach of the Road National Improvement Project. International Journal of Civil Engineering and Technology Vol 10, No 3, pp.142-147.
https://doi.org/10.15866/irece.v10i3.16221

Krasniqi, R., Doci, I., Shala, A., Berisha, R., Regulation of Traffic Flow in Small Cities with High Number of Vehicles: Case of Malisheva City – Kosovo, (2018) International Review of Civil Engineering (IRECE), 9 (4), pp. 161-167.
https://doi.org/10.15866/irece.v9i4.14300

Sanchez-Matellanes, S., Rodriguez-Hernandez, J., Castro-Fresno, D., Collazos-Arias, F., Review of Climate Risk Analysis in Infrastructures, (2018) International Review of Civil Engineering (IRECE), 9 (1), pp. 1-10.
https://doi.org/10.15866/irece.v9i1.13465

Aswed, G., Mohammed, H., Ahmed, M., Factors Affecting Safety in Construction Projects, (2020) International Review of Civil Engineering (IRECE), 11 (3), pp. 135-140.
https://doi.org/10.15866/irece.v11i3.17142


Refbacks

  • There are currently no refbacks.



Please send any question about this web site to info@praiseworthyprize.com
Copyright © 2005-2024 Praise Worthy Prize