Abstract


Cost overruns problem is still a critical issue despite many improvements are being made in the management of construction projects. Therefore, this research aims to identify the main causes of cost overruns in construction industry in developing countries and to make a critical analysis with the ones in the United Kingdom. In addition, some existing studies regarding cost estimation and cost overruns have been reviewed by the authors. In order to carry that out, in this research the authors used a secondary data collection such as books, journals, international standard and some Internet information through few search engines, like Google scholar, Science direct, Emerald Insight etc. Besides that, a qualitative research method has been used to review considerable number of books, articles, website, journals etc. In the findings, it has been concluded that the major common causes of cost overruns in construction projects in developing countries and in the United Kingdom were: change in design, inflation, increasing of the material’s price, project complexity, change in the project scope and inadequate contract and procurement method. The reasons behind each of these factors and how to minimize them have been critically explained.
Copyright © 2018 Praise Worthy Prize - All rights reserved.

Keywords


Cost Estimation; Cost Overrun; Cost Control; Cost Management; Cost in Construction

Full Text:

PDF


References


Rezaian, A., 2011. Time-Cost-Quality-Risk of Construction and Development Projects or Investment. Middle-East Journal of Scientific Research, 10(2), pp. 218-223.

Al-Shanti, Y., 2003. A Cost Estimate System for Gaza Strip Construction Contractors, Palestine, Master thesis in construction management, The Islamic University of Gaza Strip.

Akintoye, A., 2000. Analysis of factors influencing project cost estimating practice. Construction Management & Economics, 18(1), pp.77-89.
http://dx.doi.org/10.1080/014461900370979

Cook, A. E., (1991). Construction Tendering: Theory and Practice. London: B T Batsford Limited, P. 57.

Richardson, D., 2014. Productivity in the construction industry.

Jrade, A. and Alkass, S., 2007. Computer-integrated system for estimating the costs of building projects. Journal of Architectural Engineering, 13(4), pp.205-223.
http://dx.doi.org/10.1061/(asce)1076-0431(2007)13:4(205)

Smith, A. J. (1995) Estimating, Tendering and Bidding for Construction, Macmillan, London

Erkoyuncu, J. A., Durugbo, C., Shehab, E., Roy, R., Parker, R., Gath, A. and Howell, D., 2013. Uncertainty driven service cost estimation for decision support at the bidding stage. International Journal of Production Research, 51(19), pp.5771-5788
http://dx.doi.org/10.1080/00207543.2013.794318

Takim, R. (2005). A Framework for Successful construction Project Performance. Glasgow Caledonian University.

UK Contractors Group. (2009). Construction in the UK Economy: The Benefits of Investment.

Excellence, C., 2009. UK Industry Performance Report Based on the UK Construction Industry Key Performance Indicators. Available at:
https://www.glenigan.com/sites/default/files/UK_Industry_Performance_Report_2015_883.pdf.

Ashworth, A. and Perera S., 2015. Cost studies of buildings. Routledge

Bergeron, F. and J.-Y. St-Arnaud, Estimation of Information Systems Development Efforts: A Pilot Study, Information & Management, 1992. 22: pp. 239 - 254.
http://dx.doi.org/10.1016/0378-7206(92)90026-c

Morris, P. W. G. and Hough, G. H. (1987). The Anatomy of Major Projects: A study of the reality of project management. Chichester: John Wiley & Sons.

Shehu, Z., Endut, I. R., Akintoye, A. and Holt, G. D., (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), pp.1471-1480.
http://dx.doi.org/10.1016/j.ijproman.2014.04.004

Olawale, Y. A. and Sun, M., 2010. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp.509-526.
http://dx.doi.org/10.1080/01446191003674519

Kaka, A., and Price, A. D. F. (1991). Relationship between value and duration of construction projects. Construction Management Economics, 9(4), 381–400.
http://dx.doi.org/10.1080/01446199100000030

DeMarco, A. A. (2005). Six steps to project success. Cost Engineering, 47(9), 12-13.

Enshassi, A., Al-Najjar, J. and Kumaraswamy, M., 2009. Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp.126-151.
http://dx.doi.org/10.1108/13664380910977592

Koushki, P. A., Al‐Rashid, K. and Kartam, N. (2005). Delays and cost increases in the construction of private residential projects in Kuwait. Construction Management and Economics, 23(3), pp. 285-294.
http://dx.doi.org/10.1080/0144619042000326710

Jackson, S., 2002, September. Project cost overruns and risk management, In Proceedings of Association of Researchers in Construction Management 18th Annual ARCOM Conference, Newcastle, Northumber University, UK (pp. 2-4).

Flyvbjerg, Bent and Stewart, Allison, Olympic Proportions: Cost and Cost Overrun at the Olympics 1960-2012 (June 1, 2012). Saïd Business School Working Papers, Oxford: University of Oxford, 23 pp..
http://dx.doi.org/10.2139/ssrn.2238053

Chan, A. P., Scott, D. and Chan, A. P., 2004. Factors affecting the success of a construction project. Journal of construction engineering and management, 130(1), pp.153-155.
http://dx.doi.org/10.1061/(asce)0733-9364(2004)130:1(153)

Doloi, H., Sawhney, A., Iyer, K. C., and Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489.
http://dx.doi.org/10.1016/j.ijproman.2011.10.004

Raftery, J. (1994). Risk analysis in project management. Taylor & Francis.
http://dx.doi.org/10.4324/9780203474556

Reichelt, K. and Lyneis, J. (1999). The dynamics of project performance: benchmarking the drivers of cost and schedule overrun. European Management Journal, 17(2), pp. 135-150.
http://dx.doi.org/10.1016/s0263-2373(98)00073-5

Avotos, I. (1983). Cost-relevance analysis for overrun control. International Journal of Project Management, 1(3), pp. 142-148.
http://dx.doi.org/10.1016/0263-7863(83)90018-2

Flyvbjerg, B., Holm, M.S. and Buhl, S., 2002. Underestimating costs in public works projects: Error or lie?. Journal of the American planning association, 68(3), pp.279-295.
http://dx.doi.org/10.1080/01944360208976273

Love, P. E. D., Wang, X., Sing, C.-P. and Tiong, R. L. K. (2012). Determining the Probability of Project Cost Overruns. Journal of Construction Engineering and Management, 1(1), pp. 438-438.
http://dx.doi.org/10.1061/(asce)co.1943-7862.0000575

Le-Hoai, L., Lee, Y. and Lee, J. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering 12(6), pp. 367-377.
http://dx.doi.org/10.1007/s12205-008-0367-7

Eden, C., Williams, T. and Ackermann, F. (2005). Analysing project cost overruns: comparing the “measured mile” analysis and system dynamics modelling. International Journal of Project Management, 23(2), pp. 135-139.
http://dx.doi.org/10.1016/j.ijproman.2004.07.006

Frimpong, Y., Oluwoye, J. and Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21(5), pp. 321-326.
http://dx.doi.org/10.1016/s0263-7863(02)00055-8

Gkritza, K. and Labi, S. (2008). Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach. Journal of Construction Engineering and Management, 134(12), pp. 953-962.
http://dx.doi.org/10.1061/(asce)0733-9364(2008)134:12(953)

Odeck, J. (2004). Cost overruns in road construction—what are their sizes and determinants? Transport Policy, 11(1), pp. 43-53.
http://dx.doi.org/10.1016/s0967-070x(03)00017-9

Baloi, D. and Price, A. D. F. (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management, 21(4), pp. 261-269.
http://dx.doi.org/10.1016/s0263-7863(02)00017-0

Elinwa, A. U. and Buba, S. A. (1993). Construction Cost Factors in Nigeria, Journal of Construction Engineering and Management 119(4), pp. 698-713
http://dx.doi.org/10.1061/(asce)0733-9364(1993)119:4(698)

Okpala, D. C. and Aniekwu, A. N. (1988). Causes of High Costs of Construction in Nigeria. Journal of Construction Engineering and Management, 114(2), pp. 233-244.
http://dx.doi.org/10.1061/(asce)0733-9364(1988)114:2(233)

Chang, A. S. (2002). Reasons for cost and schedule increase for engineering design projects. Journal of Management Engineering, 18(1), 29–36.
http://dx.doi.org/10.1061/(asce)0742-597x(2002)18:1(29)

Flyvbjerg, B., Bruzelius, N. and Rothengatter, W. (2003). Megaprojects and risk : ananatomy of ambition. Cambridge: Cambridge University Press.
http://dx.doi.org/10.1017/cbo9781107050891

Kaming, P. F., Olomolaiye, P. O., Holt, G. D. and Harris, F. C. (1997), Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics, 15(1), pp. 83-94.
http://dx.doi.org/10.1080/014461997373132

Chen, J. H., and Hsu, S. C. (2008), Quantifying impact factors of corporate financing: engineering consulting firms. Journal of Management Engineering, 24(2), 96–104.
http://dx.doi.org/10.1061/(asce)0742-597x(2008)24:2(96)

Kaliba, C., Muya, M. and Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), pp. 522-531.
http://dx.doi.org/10.1016/j.ijproman.2008.07.003

Jergeas, G.F. and Ruwanpura, J. (2010). Why Cost and Schedule Overruns on Mega Oil Sands Projects?, Practice Periodical on Structural Design and Construction, 15(1), pp. 40-43.
http://dx.doi.org/10.1061/(asce)sc.1943-5576.0000024

Durdyev, S., Ismail, S. and Bakar, N.A., 2012. Factors causing cost overruns in construction of residential projects; case study of Turkey.International Journal of Science and Management, 1(1), pp. 3-12.
http://dx.doi.org/10.1080/23311916.2017.1383638

Chan, C. T. W. (2012). The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach. Construction Management Economics, 30(10), 903–914.
http://dx.doi.org/10.1080/01446193.2012.717706

Nawaz, T., Shareef, N. A., & Ikram, A. A. (2013). Cost performance in construction industry of Pakistan. Industrial Engineering Letters, 3(2), 19–34.

Rosenfeld, Y. (2014). Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1). Retrieved from
http://dx.doi.org/10.1061/(asce)co.1943-7862.0000789

Twana A. M. (2015). Failure In Construction Project. Retrieved from http://keu92.org/uploads/Search%20engineering/Delays%20in%20Construction%20Project%20Twana.pdf


Refbacks

  • There are currently no refbacks.



Please send any question about this web site to info@praiseworthyprize.com
Copyright © 2005-2024 Praise Worthy Prize